August 12, 2012
We did it!!!

Final Pic 4 Final Pic 1

Final Pic 1 Final Pic 3

August 4, 2011
The work done over the past few weeks has been amazing. The building is right on schedule and we are less than a week away from completion.  Here are the latest pictures of the progress.

Pic 49

Pic 50 Pic 52

Pic 47

July 13, 2011
The exterior of the building is almost complete and the interior walls have been put up.  There is a lot of work going on at the school and watching the building take shape has been really exciting.  Here are the latest pictures of the progress.

pic 44

pic 42  pic 45

pic 46

 

June 27, 2011
The building is really starting to take shape.  Brick siding is being installed and the roof is being put on.  The exterior of the building should be completed by the end of the week.

Pic 41

Pic 38

A view from inside the building.

Pic 39 Pic 40

 

June 15, 2011
Now that the metal structure is completed the exterior wall is starting to go up.

Pic 36 Pic 37

June 14, 2011
The metal framing is now complete. The next step is to put up the exterior walls.

Pic 33  Pic 34

Pic 29 Pic 31

June 8, 2011
The building is starting to take shape. After a little rain that put us about a day or so behind, the sun is out and the steel is going up.

pic 23 pic 24

pic 25

June 1, 2011
The plumbing was dug and installed and then the concrete foundation for the building was poured.  It will take about 4 days to settle and then we will start to construct the steel structure for the building.

pic 26 pic 21

pic 20 pic 22

May 23, 2011
The steel for the interim building arrives at Socrates Academy.

pic 27 pic 28

May 12, 2011
The footers for the new building are dug and poured.

pic 13  pic 14

pic 16  pic 15

April 25, 2011
Demolition of the old house is completed and grading begins on site.

pic 5  pic 6

pic 9  pic 11

April 15, 2011
Demoliton of the 'old house' begins on the new property.

 Pic 1   pic 2

pic 8   pic 3

April 10, 2011
Myers and Chapman are selected as the general contractor the interim building project.

March 24, 2011
The Socrates Academy Board of Directors and Socrates Academy Foundation Board of Trustees closed on a bank loan that loan and purchased the land for the future Socrates Academy middle school.  Click Here to read the letter that explains the full details of the purchase and loan.

March 14, 2011
Changes since the Town Hall Meeting: 

We will NOT have to move the playground or relocate the retention pond on our property.  In fact, we have moved the location of the Interim Building from behind the current gymnasium to our new property where the "old house" currently sits.  This location change will reduce our site preparation costs and help limit interference and distractions to the current campus.  These are very exciting changes as they will allow us to begin the project in April and also help keep our costs down. In addition, this building will now include a full science lab as well as classrooms for our scholars.  

February 10 and 15, 2011
Town Hall Meetings were held to provide updates in the following areas:
- Interim Building
- Middle School Building
- Curriculum
- Atheltics
- Capital Campaign

The powerpoint and audio from the Town Halls are available in the News and Events section.

The mission of the Socrates Academy is to work in partnership with parents and community to encourage our students to reach their full potential by developing critical, analytical thinking skills and becoming self-confident in a high achievement, multicultural, disciplined environment. Particular emphasis will be placed on developing proficiency in reading, writing, and mathematics both in English and Greek through the use of the Socratic Method.